Project Location: Masinloc, Philippines
Client: San Miguel Corporation
Scope of Work: On-site installation of boiler pressure parts and auxiliary equipment, including the installation of main steam pipes and boiler steel structures.
Project Location: Masinloc, Philippines
Client: San Miguel Corporation
Scope of Work: On-site prefabrication and installation of gas and air ducts for #4/#5 supercritical boilers (984T/H x 2 units) of the power plant, including the construction of a temporary on-site prefabrication workshop and the prefabrication and installation of air and flue gas ducts and support platforms.