>   Projects   > MSL#4/#5 Gas and Air Duct Fabrication and Installation
MSL#4/#5 Gas and Air Duct Fabrication and Installation
MSL#4/#5 Gas and Air Duct Fabrication and Installation
MSL#4/#5 Gas and Air Duct Fabrication and Installation
Introduction

Project Location: Masinloc, Philippines 

Client: San Miguel Corporation 

Scope of Work: On-site prefabrication and installation of gas and air ducts for #4/#5 supercritical boilers (984T/H x 2 units) of the power plant, including the construction of a temporary on-site prefabrication workshop and the prefabrication and installation of air and flue gas ducts and support platforms.

Related Cases
MSL#4/#5 2x350MW Boiler Pressure Parts and Equipment Installation
MSL#4/#5 2x350MW Boiler Pressure Parts and Equipment Installation

Project Location: Masinloc, Philippines

Client: San Miguel Corporation

Scope of Work: On-site installation of boiler pressure parts and auxiliary equipment, including the installation of main steam pipes and boiler steel structures.

View More
Masinloc#4/#5 Boiler Auxiliaries and Turbine Generator
Masinloc#4/#5 Boiler Auxiliaries and Turbine Generator

Project Location: Masinloc, Philippines

Client: San Miguel Corporation

Scope of Work: Installation of Boiler Auxiliaries and turbine generator equipment for power plant units #4/#5, including the installation of turbines, generators, condensers, and their auxiliary equipment, as well as the installation of all plant auxiliary equipment, miscellaneous pumps, embedded parts, and other mechanical equipment.